Sunday 30 March 2014

Reflection On The Week (26): Starting Monday 25th March

Week Summary
Reflection on Practice - Spent the start of the week working on the big presentation on Wednesday. That is now the module finished which should hopefully free up more time for the other 2 modules! :D I think the presentation went well. This module has definitely helped me to start researching animation that I'll be specifically working on for Advanced Production.

Advanced Production - This week's supervisor meeting was postponed again, but had a team meeting anyway to discuss everything we need to do, especially as Kirti will be away for 3 weeks from this weekend. So we made sure we all know what we're all working on.

Going Live - Been working on rigging mostly this week for the model I've been working on. Should be able to start animating next week!


Monday 25th Mar
Putting presentation together for Reflection On Practice module.


Tuesday 26th Mar
Supervisor Meeting has been postponed till at least next week. Still had a team meeting though for a catch up:
- 3D animatic - needs to be finished before next supervisor meeting.
- Shot List is done, just needs the environment locations added once the 3D animatic is complete.
- The Production schedule needs to be re-evaluated.
- Flesh out Production Bible, including Prop designs and foliage designs. (dog house, dust bins, rake, football, biscuit, tools by shed, lawn mower, brambles, leaves, plants, trees, stones)
- Human model to go through the list of adjustments, then re-assess before it goes into rigging.
- Example of mouths needed.
- Bird to be modeled next.
- Who models the dog is yet to be decided, will evaluate how production is going and who is working on what, could find someone else to model it for us if we are all too busy?
- Environment continue to be modeled.
- Texturing tests to be started - with the watercolor look of the concept art.
- Sheng has volunteered along with Kirti to work on the Sound effects.
- Need to find someone to do a soundtrack for the film.

Writing out notes and practicing for the presentation tomorrow.

Wednesday 27th Mar
Mock Conference all day. Presented using the PowerPoint I put together. It went well, glad that's one module finished now though, more time to work on the other 2 modules! :D

Baked some cakes to add to our fundraiser raffle prizes tomorrow night :)

Thursday 28th Mar
Had a class meeting to discuss Going Live and the fundraiser tonight. Kieran and I went discussed the rough Shot List which I'll be drawing up for the wall, so we can all keep an eye on how the production is going and what still needs finished.

Done some more rigging for the Going Live model I've been working on.

Iced the cupcakes I made last night for the raffle, then it was time for our class's fundraiser! Was a great night! :)

Weekend
Done some observational drawing: Click here for relevant blog post link

Drew out the Shot Checklist for Going Live:

Finished the rig for my Going Live model. Now onto weight painting. However I came across a problem where my weight painting never stayed how I had just painted it. Researched the problem and found out it was redistributing the weights every time. So the way to fix it is to switch on the padlock in the Paint Weights Tool Box.

No comments:

Post a Comment